HOMEABOUT USCONTACT USSITE MAP  CELEBRATING OVER 25 YEARS SERVICE TO THE INDUSTRY
DIY POOL KITSPROFESSIONAL POOL KITSABOVE GROUND POOLSFLOORING SUN DOMES  
LINKSAUTOMATIC CLEANER  SAFETY COVERSSOLAR HEATINGPOOL EQUIPMENTTOYS & GAMESINFLATABLES

7 Day Installation Guide

DAY 1
Dig a 4' depth rectangle with 2' radius corners


 

     

DAY 2
Installation of pool panels and bracing


 

     

DAY 3
Install Aluminium Coping and apply bottom
concrete ringbeam

 

     

DAY 4
Apply floor screed


 

     

DAY 5
Install pool liner, add the water & commence
backfilling

 

     

DAY 6
lay top concrete ringbeam


 

     

DAY 7
Connect up filtration unit and enjoy!


 

     
     
     


To watch a video of this installation click here (10MB .WMV)


TO download the Installation Manual click here.pdf