TILESTONE POOL INSTALLATION IN HAMPSHIRE
This Luxe Tilestone pool was recently installed in Hampshire, incorporating the Aquamatic “hidden leading edge system” with our Aquamatic safety cover. Water-tec LED stainless steel WT2 lights were incorporated into the tiles, and all fittings are stainless steel.
It was necessary to use a 20mm stone for the lid housing, and 50mm for the remaining three walls. Using 600 x 600mm tiles around the edge of the pool covered the hidden edge entirely. Alternatively, 20mm stone can be used with a 50mm aluminium edging strip.
Their Pool Specifications
Pool size: 9 x 4.25m
Depth: 1.5m with flat bottom
Capacity: 55cbm (12,150 gallons)
Structure: GRP laminate shell with steel frame and 50mm Extruded PU Foam Insulation within walls and floor
Thermal value: U-Value of 0.25 W/M2K
Pool colour: Green with grey grout
Tiles: Waxman Ocean/Cocos 36 x 36mm cord black ceramic tile
Adhesive: Kerakoll Superflex (2 part)
Grout: Fugalite Bio in iron grey
Pool fittings: Stainless Steel – Marpiscine
Lighting: Water-Tec LED Stainless Steel WT2 (100mm dia.)
Heating: 16kW Waterco Heating Pump
Filtration: Waterco 600mm bobbin wound filter
Filter media: Glass pearl
Paving: Cranbourne 600 x 600 x 20mm Garda Porcelain
Paramount Pools is known for supplying high-quality pool equipment to professional pool installers and retail outlets throughout the UK, including the Channel Islands and Ireland, and we welcomed the challenge of incorporating a system that was robust, reliable, and produced consistently clear pool water for its affluent residents and their guests.
The Installation Time
Excavation and concrete base – 5 days
One piece pool installation – 1 day
Back filling – 3 days
Tile preparation – 1 day
Tiling – 3 days
Concrete ring beam surround – 2 days
Electrical supplies and connections – 2 days
Filtration – 1 day
Paving surround – 5 days
Cover installation – 1 day
Over the course of 23 days, the meticulous process of installing a pool unfolds seamlessly. Commencing with a comprehensive excavation and the establishment of a sturdy concrete base over 5 days, the groundwork sets the stage for the swift installation of a one-piece pool within a day. Subsequent steps include the careful backfilling process spanning 3 days, followed by a day dedicated to tile preparation and an additional 3 days for the intricate tiling work.